Tundish Working Linings

 

Dry Vibrating Material

  • Clean Steel
  • Easy Installation
  • Fast & Low-energy preparation
  • High sequence duration


Plaster

  • Economic solution
  • No machinery required
 

 

 

Type

installation

Bonding

required water (%)

Preheat Time (H)

Dry Mass

Semi-Dry Vibration

Chemical

1.5-2

1

Plaster

Troweling / spray

Chemical & Ceramic

23-26

Up to 10